PTC HEATER ASSEMBLY > INSTALLATION


  1. INSTALL QUICK HEATER ASSEMBLY

  2. INSTALL NO. 2 AIR DUCT SUB-ASSEMBLY

  3. INSTALL NO. 1 INSTRUMENT PANEL BRACE SUB-ASSEMBLY (for LHD)

  4. INSTALL INSTRUMENT PANEL SUB-ASSEMBLY (for LHD)

  5. INSTALL INSTRUMENT LOWER PANEL (for RHD)